ABJ Case Study: Drone Stockpile Volume Measurements
Type of Job/Services Completed:Â Stockpile Volume Measurement Location of Job: Plainsboro NJ The Problem The client needed more detailed reporting compared with traditional stockpile volume measurement techniques. They were building a fitness center in Plainsboro and were required to use a specific type of clean
ABJ Case Study: Drone Siding Inspection of 15 Buildings
Type of Job/Services Completed: Drone Siding Inspection of 15 Buildings Location of Job: Bergen County, New Jersey The Problem The customer needed siding replaced for a 15-building community. Before work could begin, they needed to collect evidence showing that the current state of the siding was in
ABJ Case Study: Drone Roof Inspection, Orthomosaic Imaging, and Thermography
Type of Job/Services Completed:Â Roof Inspection, Orthomosaic Imaging, and Thermography Location of Job: New Jersey The Problem The customer needed roof inspections completed for two condo associations, each with around 30 buildings. ABJ Drones was engaged to complete the roof inspections so the client could
ABJ Case Study: Photogrammetry of Roofs for Solar Panel Construction Planning
Type of Job/Services Completed:Â Photogrammetry of Roofs for Solar Panel Construction Planning Location of Job: Multiple Locations in Connecticut The Problem The client plans and installs solar panels for businesses. For this project, they were in the design stage for installing roof-mounted solar panels on
ABJ Case Study: High-Rise Facade Drone Inspection
Type of Job/Services Completed:Â High-Rise Facade Inspection Location of Job:Â Jersey City, NJ The Problem The client needed to inspect the entire facade of the Trump Plaza building (532ft tall). They needed to see if the issues that were visible at ground level were consistent up to the 55th
ABJ Case Study: Turbidity Monitoring for Dredging Project
Type of Job/Services Completed: Turbidity Monitoring for Dredging Project Location of Job: Columbia, MD The Problem The client had a lake that was actively being dredged and needed to be monitored to ensure the increased turbidity (dirt, silt, and other suspended solids being kicked up by the