Vestas Wind Turbine Inspection in Canada with Drones
Type of Job/Services Completed: Drone Wind Turbine Inspection - Optical and Thermal Imaging Project Dates December 2019 – January 2020 About The Project ABJ deployed its WindVue technology to find both internal and external problems with the WTG blades during winter in Canada. The objective
ABJ Case Study: Inspecting Issues for E.ON’s Pennsylvania Wind Farm
Type of Job/Services Completed: Drone Wind Turbine Blade Inspection with Thermal Imaging Project Dates March 2019 – April 2019 About The Project ABJ worked with E.ON to find internal issues on their wind farm in Pennsylvania. They had purchased this wind farm recently and wanted
ABJ Case Study: DNV GL U.K. – Optical and Thermal Drone Inspections of WTG’s
Type of Job/Services Completed: Drone Wind Turbine Blade Inspection with Thermal Imaging Project Dates Ongoing Global Contract – Started in April 2018. Work with DNV GL in multiple countries. DNV GL U.K. – ABJ does DNV GL client projects providing the drone inspection services of WTG's.
ABJ Case Study: Lightning Flashover Inspection of Vestas V136 Wind Turbine Blades
Type of Job/Services Completed: Drone Wind Turbine Blade Inspection with Thermal Imaging The Purpose We provided a test project for our client to determine if lightning flashover damage to the interior shell of Vestas V136 wind turbine blades can be detected using ABJ's proprietary WindVue technology. Three
ABJ Case Study: 10MW Solar Panel Inspection in India
Type of Job/Services Completed: 10MW Solar Panel Inspection using Optical and Thermal Payloads on a DJI M210 Drone The project was located in South India. About the Client Pace Power Systems Pvt Ltd was established in 2003 and has since grown into a leading OEM (Original Equipment
ABJ Case Study: Building Facade and Roof Drone Inspection
Type of Job/Services Completed:Â Building Facade and Roof Inspection The Problem The structure was originally a 5 tower + 4 connecting core building that was used for manufacturing. When it was no longer used for manufacturing, two of the towers and three connecting cores were converted into lofts.